Today got off to a late start as we got lost in traffic leading to us being well over an hour late at the building site. We then played a game called Shaolin Master in which everyone would have to strike one of four poses and then if anyone had the same pose as the leader they would be eliminated. This ended in a tense final between Derin and Pritha in which Pritha won.
We then started working on site with everyone’s first task. For the boys, it was cleaning the worksite of small bits of wood and wires. The girls then split into two groups, one removed nails from planks and the other group cleaned.
The main challenge of the day was once more the extreme heat, which made every job much more difficult. For the boys, who were carrying wooden beams from the second floor to the ground as well as metal support beams, the heat made being on the ground floor extremely tiring. We had to take a few extra breaks to rehydrate due to the heat. By the end it was satisfying to see the work that we had done.
Another challenge for some was a small dog named Bella who would love to play with us. We had to make sure she was not in the way whilst we were working. This is why I consider her a challenge that had to be worked around.
The girls mostly spent their day removing nails from pieces of wood from the concrete casing, which the workers were breaking throughout the day. One of the girls labeled the work as ‘therapeutic’. The work was mostly done with crowbars and hammers. At one point the boys joined in on the fun! The other group of girls mainly helped clear the site at the bottom. Overall everyone had fun and worked to the best of their abilities on this very hot day.
By Derin and Pietro